Church Lane Primary School Playing Field Construction

April 2018

During the Easter holidays we constructed a new playing field Church Lane primary school.

The existing surface was removed with a GKB combinator. The playing field levels were set and topsoil imported, in piles, across the site. We used a Volvo excavator to laser level the topsoil ready for a final trim with a more accurate mid mounted laser grader.

The surface was then lightly cultivated and prepped using a Blec Pedestrian Stonerake. Finally, we spread fertiliser at 50gm2 and seeded at 70gm2 with a Blec Cultipack.

Client Projects