Lincoln City FC Main Pitch Construction
May 2021
During this project we completely rebuilt the main pitch at Lincoln City FC's Sincil Bank. The pitch construction included new drainage, a gravel carpet, multiple sand layers and the amelioration of fibresand for added stability. A new irrigation system was installed along with pitch kerb edging.