Nottingham Racecourse Track Drainage and Sump Installation

August 2018

In August we installed a 200 linear metre main drain into which we installed and connected 1000 linear metres of lateral drains. We also installed 5000 linear metres of sand slits at 1m. During the project we also installed a wet sump. This included the supply and installation of 2 concrete chambers, a pump, float switch, control cable and all electrical connections.

Client Projects