Royal Norwich Golf Club Fairway Sand Slits
April 2019
In preparation for the opening of the new Royal Norwich Golf Course in Weston Longville we installed secondary fairway drainage.
The scope of works included:
- Excavate trenches 300mm deep at 1m centres.
- Backfill trenches with sports sand and compact to just below the surface.
- Top up trenches with sports sand to ensure a flush finish with the fairway.