Sheringham Golf Club Tee Levelling
November 2018
In November we renovated two tee boxes on the course. The greenstaff stripped the existing turf ready for us to cultivate and laser level. Additional topsoil was spread and the tee's laser graded a second time before final ground preparations and the installation of Tillers Fescue turf.